Vending Machine for a Construction Site: BC Permit Data

When a vending machine for a construction site makes sense in BC: 2026 permit data for big Vancouver and Surrey builds, WorkSafeBC site rules and setup.

By Mahdi Dialden6 min readFiled under Hosts, Data, Construction, Vancouver, Surrey

Short answer: a vending machine for a construction site makes sense on a large, long build: a crew of 25 or more, working for many months, with trailers and power. In BC that's mostly mid-rise and high-rise residential, hospitals, schools and big industrial buildings. From January to September 2026, Vancouver issued 56 new-building permits worth $5 million or more and Surrey issued 30, together about $6.1 billion of construction. A drink-and-snack machine by the site trailers serves the crew at breaks and before the first shift, when nothing nearby is open.

This report is for general contractors, site superintendents and developers in Metro Vancouver, British Columbia. It's built on the two cities' open permit data and WorkSafeBC's rules for construction sites.

How many big builds there are

New-building permits, Jan–Sep 2026VancouverSurrey
All new-building permits709728
$1M–$5M176184
$5M or more ("large")5630
…of which $20M or more3920
…of which $50M or more279
Combined value of large permits$3.30 billion$2.81 billion
Median value of a large permit$42.7M$24.9M

Construction values as stated on each permit. Source: City of Vancouver and City of Surrey issued building permits, extract 2026-10-12. VendFynd analysis.

Most new-building permits are houses, suites, duplexes and townhouses under $1 million (477 in Vancouver, 514 in Surrey): too small and too short for a machine. The large ones are where crews stay for a long time.

Vancouver is ahead of last year. From January to September 2025, the City issued 929 new-building permits, 49 of them worth $5 million or more ($2.25 billion). The same months of 2026 brought fewer permits (709) but more large ones (56, $3.30 billion).

What the large builds are

Large permits ($5M+), Jan–Sep 2026PermitsCombined value
Vancouver
Apartments and mixed-use residential39$2,461.1M
Hospital and care facilities6$374.4M
Schools3$129.0M
Industrial2$84.0M
Offices3$45.3M
Other (a hotel, a community centre, a utility building)3$210.1M
Surrey
Apartments (2,528 units)18$861.0M
Warehouses7$126.7M
Offices2$36.6M
Hospital1$1,700.4M
Student residence1$80.2M
Daycare1$5.3M

Surrey's figure is dominated by one hospital permit of about $1.7 billion. Leave it out and Surrey's other 29 large permits total about $1.11 billion, more than three-quarters of it apartments.

How long these builds run isn't in the permit data, but government project announcements give a sense of it: the Province's release for UBC's 1,508-bed student housing project put construction start at fall 2026 and phased openings from fall 2028 to fall 2029. Multi-year jobs like that are the ones worth equipping.

What BC's rules say about site amenities

  • Big sites have their own washroom rules. Since October 1, 2024, WorkSafeBC's regulation defines a "specified construction site" as one where "25 or more workers will be present at any time during the undertaking of the construction project" (s.20.3.1). There, the employer must provide enough flush toilets (or chemical toilets if flush ones aren't practicable), enclosed, lit, ventilated, heated where practicable, with handwashing and cleaning records (s.20.3.2). On a multiple-employer site, those duties also apply to the prime contractor.
  • Eating areas only in some cases. Under s.4.84, the employer must provide an area suitable for storing and eating food only where food could become unwholesome because of workplace contaminants, or where eating is restricted at the workplace.
  • Keep site structures out of the drop zone. Temporary washrooms, offices "and similar structures" must sit outside areas where falling materials could hit them, or under protective canopies (s.20.9). A vending machine belongs with the trailers, not by the hoist.
  • Meal breaks, not meals. The Employment Standards Act requires an employer to ensure "no employee works more than 5 consecutive hours without a meal break" of at least half an hour (s.32). Nothing requires food on site, which is the gap a machine fills, especially on early starts.

Setting one up on a site

  1. Size it to the peak crew. 25 workers is the line WorkSafeBC draws for a big site; a machine starts to make sense from about there, rising with the trades on site. Our site-fit scorer gives a quick read.
  2. Put it in or beside the lunchroom trailer, on a level base, sheltered from rain and outside any falling-material zone. Check the door and route: a full-size machine is 72 inches tall and weighs roughly 490–690 lb (space and power checklist, door-fit checker).
  3. Power: a standard grounded outlet on the trailer's supply. A refrigerated drink machine uses about 3.7–4.0 kWh a day (power cost calculator).
  4. Card readers need signal. Most crews pay by card or phone; check cell coverage at the trailer. For cash versus card, see does card-only lose customers.
  5. Match the agreement to the job. A build ends, so month-to-month terms with 30 days' notice and no-cost removal matter more here than anywhere. With VendFynd that's standard. Compare offers with the agreement checklist.

The same logic as our warehouse shift-work guide applies: long days, fixed breaks, nothing open nearby. A machine is $0 to the contractor: the operator covers the machine, delivery, stocking, service and removal, and you provide the spot and an outlet (about $15–20 a month in power). See if your site qualifies.

About this data

  • Datasets: City of Vancouver issued building permits and City of Surrey issued building permits, extracted 2026-10-12. Contains information licensed under the Open Government Licence – Vancouver and the Open Government Licence – Surrey.
  • Method: permits for new buildings only (Vancouver "New Building", Surrey "New"), issued January 1 to September 30, 2026; Surrey's open dataset starts January 5, 2026, so there's no Surrey 2025 comparison. Values are construction values stated on permits. Use groups come from each permit's use fields; a mixed-use permit is grouped by its main use.
  • Limits: a permit isn't a start date, and permits don't state crew sizes or durations. Alterations and renovations aren't counted. No builder or project is named.

Sources

All accessed 2026-10-12.

Frequently asked questions

Can you put a vending machine on a construction site?

Yes, on the right site. It works on large, long builds where a crew of 25 or more works for months, the machine can sit in or beside the site trailers outside any falling-material zone, and there's a reliable power supply. A short renovation or a house build is usually too small and too brief.

Do construction sites in BC have to provide a lunchroom?

Not in every case. WorkSafeBC's s.4.84 requires a suitable area to store and eat food only where food could be contaminated at the workplace or eating is restricted there. Sites with 25 or more workers have specific toilet and handwashing rules under s.20.3.2, but nothing requires food to be sold on site.

How many large building permits did Vancouver and Surrey issue in 2026?

From January to September 2026, Vancouver issued 56 new-building permits worth $5 million or more ($3.30 billion combined) and Surrey issued 30 ($2.81 billion, including one hospital permit of about $1.7 billion). Most are apartment buildings.

Who decides on vending at a construction site?

Usually the general contractor or prime contractor, who runs the site and the trailers. On a multiple-employer site, BC's construction toilet rules already put duties on the prime contractor, and amenities like a machine are agreed with the same people.

New Businesses in Vancouver, Burnaby and Surrey: October Radar

September 2026 in full: new business licences and large permits in Vancouver, Burnaby and Surrey, month on month, counted from city open data.

New Workplaces in Metro Vancouver: Summer 2026 in Numbers

232 new licences and permits for offices, clinics, warehouses and housing in Vancouver, Burnaby and Surrey, July–September 2026, counted from city open data.

Vending Machine for a Factory: BC Plant Sizes and Rules

Is your plant big enough for a vending machine? Vancouver and Burnaby manufacturer licences by size, BC meal-break and eating-area rules, and setup.